TPC No.4 Nuclear Power Plant

Name of Project Duration of Project Annual Production Description of Project
No.1 & 2 Multi-nozzle Project2002.12~2003.052 sets. Including joined straight pipe, outlet master, installment support, spray nozzle, supporting
Truss of Ciruclation cooling water chute supply2002.03~2002.065 sets
Steel Structure for Units 1&2 2002.08~Steel Structure: 2396 Tons
Circulation Cooling Water Discharge Tunnel Project2001.11~2002.09Material: SKY490; Steel Pile: 12t x 1500OD x 36300L x 80pcs, Steel Pipe: 60pcs